Getting started with your Ilion III system
- Plug in all required cables according to the Getting Starting Guide.
- If the system includes an optical microscope, install the microscope and the imaging PC.

- Connect the monitor, mouse, and keyboard to the PC.
- Place the monitor, mouse, and keyboard next to the instrument on the bench.
- Plug in the power cables for the PC and the monitor.
- Connect the Ethernet cable from the Network port on the back of the instrument to the Network port on the rear of the PC labeled To ion beam instrument.
- This connection is an add-in network board.
- Connect the second network port on the PC to the internet if remote access is required.


- Slide the rack and pinion mount onto the post on the top of the instrument.
- Plug Cable A (shown in the first picture above) into the connector on the top‑right of the cabinet.
- Plug Cable B into an available USB port of the imaging PC.
- Plug Cable C into the Camera Trigger port on the back of the instrument.

- Check the system for gas-line leaks.
- Turn on the main power switch located directly above the power cable.
- Purge the argon gas line.
- Disconnect the argon hose from the back of the tool.
- Set the flow rate to 172 kPa (25 psi).
- Open the flow valve and let the argon run through the hose for 1 minute.
- While the argon still flowing, reconnect the hose to the back of the tool.
- Confirm the ion sources are ready.
- Start milling at 8 kV, planar mode.
- Confirm both ion sources have an accelerating current greater than 20 µA.
- Stop milling.

- Purge the ion sources overnight.
- Disconnect the cold cathode gauge.
- Set the gas flow to Manual.
- Set both ion sources to 1 sccm.
- Leave to purge overnight.

- Zero the mass flow controllers.
- Set the gas flow to Automatic.
- Press Zero to zero the mass flow controllers.

- Align the ion sources.
- Insert the alignment screen.
- Align both ion sources at 0°.
- Use:
- the left front beam sector to align the left ion source.
- the right front beam sector to align the right ion source.
- Center the beams to the feature located in the center of the alignment screen.


- Mix the silver paint thoroughly.
- A large clump may be present at the bottom of the bottle; vigorously mix it with the solvent.
- This thorough mixing is required only once.
- Mount the sample by following the reference video
The system is now ready for milling.